Skip to content
ASNICAR & ASSOC.

Integrations

Your systems, connected. Your data, entered once.

Every time data moves by hand, the numbers can drift apart. A measurement gets typed into a takeoff tool, exported, retyped into the estimate, then rebuilt again as a job budget. The connections below take those hops out.

Talk to our team

10 connections across 4 stages

Stage 01

Takeoff into estimating

The connection that matters most: quantities measured off the drawings landing in the estimate without anyone re-keying them.

  • eTakeoff Bridge

    eTakeoff Dimension → Sage Estimating

    The native link between eTakeoff Dimension and Sage Estimating. Measured conditions map to estimate items, and quantity revisions flow through rather than being retyped.

  • BridgeIQ

    We built this

    On-Screen Takeoff → Sage Estimating

    Our own connector for teams standardized on On-Screen Takeoff. The estimator pushes quantities into Sage Estimating in one step, with nothing re-keyed.

Stage 02

AI takeoff

Automated quantity extraction feeding the same estimating database, rather than living in a silo beside it.

  • Togal.AI

    Plan sets → eTakeoff Dimension

    Automated space and area detection from plan sets, with results landing in Dimension where an estimator can check them before they reach the estimate.

  • Snap AI

    Plan sets → eTakeoff Dimension

    AI-assisted measurement inside the takeoff workflow, cutting the manual tracing on repetitive conditions.

Stage 03

Bid management

Subcontractor quotes arriving from the platforms your subs already use, leveled against the estimate you built.

  • BuildingConnected

    BuildingConnected → BidMatrix

    Bid invitations and incoming subcontractor quotes flow into BidMatrix for leveling, so bid day analysis works from the same data your subs submitted.

  • SmartBid

    SmartBid → BidMatrix

    Subcontractor bid solicitation and quote capture connected through to leveling and comparison.

Stage 04

Estimating into operations

The won estimate becoming the job budget, without a re-entry step that introduces variance on day one.

  • Sage Intacct Construction

    Sage Estimating → Sage Intacct Construction

    Awarded estimates carry through to job setup and cost codes, so budget-versus-actual reporting starts from the number you bid.

  • Sage 300 CRE

    Sage Estimating → Sage 300 CRE

    Estimate data flows into job cost, keeping the estimating and accounting sides on one set of cost codes.

  • Sage 100 Contractor

    Sage Estimating → Sage 100 Contractor

    Estimate to job budget for teams running Sage 100, with the same cost structure on both sides.

  • Procore

    BidMatrix ↔ Procore

    Bid and project data shared with Procore so preconstruction hands off to project management without a manual rebuild.

BridgeIQ exists because a client asked.

If the connection your workflow needs doesn’t exist, that’s usually a build, not a dead end.

Email
sales@asnicarandassoc.com
Response time
One business day, usually the same day.